IIIP · Industrial Infrastructure Intelligence Platform
Iberian Grid
Stability
Atlas
April 28, 2025 · Failure Mode Analysis · V1 Draft
Cascade Sequence · 12:32–12:33 CEST
12:32:00 – 12:32:48
Peninsula-wide
Large renewables (>5 MW) shed
–500 MW
in 48s during schedule adjustment. Fixed power factor mode injects reactive ramp into transmission.
12:32:57 · Event 1
Granada Province
PV generation trip:
–355 MW
. Voltage begins rising in southern Spain.
12:33:16 · Event 2
Badajoz / Extremadura
PV + CSP cascading trip:
–727 MW
. Overvoltage exceeds 435 kV. Shunt reactors available but not activated.
12:33:18 · Event 3
Sevilla Province
Third cascade:
–550 MW
. Five further provinces lose
–928 MW
in 2 seconds. Loss of synchronism with European grid at 12:33:21.
Spain–France NTC Constraint
Avg. utilization rate 2025
78%
Congestion 34.3% hrs (FR→ES) / 27.5% hrs (ES→FR)
Operational NTC capacity
2,800 MW
Baixas–Santa Llogaia (2015). Eastern Pyrenees only.
Bay of Biscay HVDC (proposed)
+3,000 MW
Onshore route agreed. Physical escape valve — not available on April 28.
Map Layers
400 kV Transmission
Primary grid trunk routes
220 kV Transmission
Secondary corridors
Solar / CSP Generation
Installed capacity clusters
Wind Generation
Onshore capacity clusters
Reactive Power Deficit Zone
Extremadura–Andalusia corridor
Failure Event Nodes
Cascade sequence · Events 1–3
Spain–France Border
NTC saturation annotation
Bay of Biscay HVDC
Proposed route (not operational)
28 April 2025 · 12:33 CEST
First overvoltage-driven blackout in history