IIIP · Zaragoza South
Generation Paradox — Grid Corridor Analysis
V2 · Cluster Analysis
Layer Control
400 kV Lines
220 kV Lines
132 kV & below
Substations
Wind Turbines — Grid (330)
Cluster points
Fuendetodos Clipped
15 km Regional
Zone Circles
QGIS Export Opacity
80%
Basemap
Dark
OSM
Topo
Fuendetodos Cluster
● BESS Zone ≤2 km
Units
17
Capacity
34.0 MW
● Cluster Zone ≤5 km
Units
120
Capacity
236.5 MW
● Regional ≤15 km
Units
350
Capacity
1,103.4 MW
Total corridor
450 · 1,424.6 MW
Max voltage
400 kV
Region
Aragón, ES
Legend
400 kV transmission
220 kV transmission
132 kV & below
Substation / Switching
Fuendetodos Clipped (≤5 km)
15 km Regional gen.
Grid turbine
2 km BESS Zone
5 km Cluster Zone
15 km Regional